21st Century Street

Monday, August 25, 2008

Concepts for 21st Century Street

The sketches in this blog illustrate our ideas for ways to re-design the intersection of 9th St. and 4th Ave. in Brooklyn (see intersections images below). A short description of what the intersection is like can be found here: http://21stcenturystreet.org/about/thesite

We visited the intersection and spoke to people about some of the problems and opportunities there. We also surveyed our friends and family members via email. Based on the information that we uncovered, these are some of our initial concepts. While we think we have some good ideas, the most valuable feedback can only come from those who live near or use this intersection. Which concepts do you like and why? Are there some ideas that just don't seem to make sense? Which of these ideas would be most beneficial to you? Do you have any additional ideas?


Please comment in the comment boxes below each concept. Thanks for your participation, and we look forward to hearing what you think and incorporating your ideas into our re-design.





Concept sketch 1



1. A clear tunnel overpass so that subway trains to be seen crossing over the intersection. This replaces an ominous closed-in structure and allows people to match the auditory cues that a train is passing with what they see.
2. An elevated walkway allows people to cross from one side of the street to the other. Foot traffic on this walkway creates energy captured to power low-intensity LED lights embedded in the pavement below which provide signals to drivers and bikers.
3. Vendor areas below the bridge allow local farmers to sell organic and healthy foods.

Concept sketch 2

1. Bike-friendly stores racks outside and encourage cyclists to bring their bikes inside.
2. The parking lanes on 4th ave are replaced with a green bike paths in both directions, marked with directional cues and separated from the highway by small trees.
3. Sculptural bike racks line the street serving both practical and artistic purposes.

Concept sketch 3

1. On-street parking is eliminated and parking garage is constructed.
2. Parking cost is based on fuel efficiency of car. Parking fees can be reduced with the purchase of carbon offset credits.

Concept sketch 4


1. LEDs are embedded in the road and the bike lane before the stoplight (fading from green to yellow to red) to indicate to drivers/riders that a stop is ahead.

2. LEDs line the bike path providing an additional visual separation (particularly at night).


3. Pedestrians have significantly more time to cross the street than they do currently.